A roofer shoveling old shingles off a brick ranch house into a dumpster, half the roof already torn off to the bare wood deck, red clay in the flower beds

FORTIFIED roof replacement in Edmond, OK

A roof replacement with us is a tear-off to the wood deck and a new roof built to the IBHS FORTIFIED Roof standard: deck seams sealed, the deck nailed with 8d ring-shank nails, drip edge fastened every 4 inches along the eaves and rakes, and shingles rated for high wind. An independent evaluator checks the photographs and IBHS issues the certificate. A Strengthen Oklahoma Homes grant of up to $10,000 can go toward it.

  • Sealed deck, ring-shank nails, drip edge every 4 inches
  • Every stage photographed for the evaluator
  • The grant and the insurance discount explained

Or call or text 405-555-0147

Tell us about the roof you have now

We answer the same day. The night of a storm, we answer until the last tarp is down.

Shingles gone and rain coming in right now? Call or text: 405-555-0147

The FORTIFIED Roof standard, in five numbers

These come from the 2025 FORTIFIED Roof standard and the Strengthen Oklahoma Homes program. They are what the evaluator looks for in our photos.

  • 8dring-shank

    Deck nails

    Rings on the shank grip the wood. Spaced 6 inches on a new deck, with extras at 4 inches on an existing one.

  • 4inches

    Drip edge fastening

    On center, at most, along every eave and rake. No staples, no cap nails.

  • F / Hclass

    Wind-rated shingles

    Rated ASTM D3161 Class F or ASTM D7158 Class H. The Hail Supplement also needs a Good or Excellent IBHS hail rating.

  • 5years

    Certificate

    Issued by IBHS after the independent evaluator reviews the work.

  • $10,000up to

    State grant

    Strengthen Oklahoma Homes, toward a FORTIFIED Roof, High Wind with the Hail Supplement.

How a FORTIFIED roof goes on, from the wood up

This is the order the roof goes back together. Cal photographs each stage the evaluator needs to see before the next one covers it.

  1. Tear off to the deck.

    Old shingles and underlayment off, soft boards replaced, the yard protected.

  2. Renail the deck with 8d ring-shank nails.

    Photographed so the evaluator can see the spacing.

  3. Seal the deck.

    Self-adhering tape over the seams between the boards, so water stays out if shingles blow off.

  4. Underlayment, then drip edge over it.

    Metal drip edge at the eaves and rakes, fastened every 4 inches, never stapled.

  5. Adhered starter and wind-rated shingles.

    Starter bonded at the edges where wind pulls hardest, then Class F or Class H shingles, ridge caps and flashing.

  6. Photos to the evaluator, certificate from IBHS.

    The evaluator reviews the stages, and IBHS issues the certificate in your name.

Book a free wind and storm check

“We asked about the FORTIFIED grant before we even had a storm. Cal walked us through what the evaluator would need, photographed every stage on the roof, and the certificate came through with no surprises.”
Ana P. FORTIFIED roof replacement, Edmond Sample review,

Why the deck gets sealed, even under new shingles

The deck is the layer of plywood or OSB the whole roof is nailed to. On most roofs, the seams between those boards are just gaps under the underlayment. When a storm strips shingles off, rain finds the seams and runs straight into the attic and the ceilings.

A sealed roof deck closes those seams with self-adhering tape before anything else goes on. If the wind does take shingles, the water stays on top of the deck instead of coming through it.

Then the deck gets 8d ring-shank nails, whose rings lock into the wood instead of working loose as the deck flexes.

Book a free wind and storm check

Gloved hands pressing black self-adhering tape along the seams of a bare OSB roof deck, with a roll of tape and a hand roller beside them

Drip edge every 4 inches, because wind starts at the edge

Drip edge is the bent metal strip along the eaves and the rakes. In a hard wind, the edge is where the roof lifts first, and a loose drip edge lets the shingles above it go with it.

On a FORTIFIED roof the drip edge goes over the underlayment and is fastened every 4 inches at most, with no staples and no cap nails. The starter course above it is adhered, so the first row of shingles is bonded to the edge instead of sitting loose on it.

When a Moore family's back slope let go one night, the old edge had been stapled. We tarped it that night and rebuilt it with a sealed deck and ring-shank nails.

“The wind took a strip of shingles off the back slope at ten at night. Cal had a tarp battened down before midnight, and the next week he showed us why the old roof let go: staples instead of nails along the edge. The new roof went on with a sealed deck and ring-shank nails.”
Brooke and Terrell W. Emergency tarp and roof replacement, Moore Sample review,

Book a free wind and storm check

A roofer in a safety harness hammering a nail through a metal drip edge along the eave of a house, underlayment laid on the deck above it

Strengthen Oklahoma Homes and the insurance discount

The grant

Strengthen Oklahoma Homes is run by the Oklahoma Insurance Department. It offers grants of up to $10,000 toward a FORTIFIED Roof, High Wind with the Hail Supplement, on an owner-occupied primary residence that has wind coverage and a homestead exemption. The current round opened July 13, 2026. Funding is first come, first served while it lasts.

The program asks for three bids from approved contractors, and the grant is paid to the contractor, not to you. The independent evaluator's fee is not covered. Read the current rules at oid.ok.gov/okready before you apply.

The discount

Under 36 O.S. 962, insurers must offer a discount on the wind and hail part of the premium for a FORTIFIED retrofit where it is actuarially justified. You keep the certificate. Send a copy to your agent and ask what your policy offers.

Where your town needs a re-roof permit, as Oklahoma City and Yukon do, we pull it.

What is on your written estimate

Each line is something you can check.

Squares of roof

The measured area in squares, 100 square feet each, slope by slope.

The FORTIFIED parts, on their own lines

Deck tape, ring-shank renailing, the drip edge and the adhered starter, so you see what the standard adds.

Shingles by name and rating

The shingle line, its Class F or Class H wind rating and its IBHS hail rating.

Deck boards, permit and cleanup

How replaced boards are counted, the city permit where there is one, the dumpster and the magnet sweep.

FORTIFIED roof questions we hear most

What is a FORTIFIED roof?

A roof built to a standard from the Insurance Institute for Business and Home Safety (IBHS) so it stays on in high wind and keeps water out if shingles do go. It is not one product. It is a sealed deck, 8d ring-shank deck nails, drip edge fastened every 4 inches, an adhered starter and shingles rated ASTM D3161 Class F or D7158 Class H, all checked by an independent evaluator.

Who qualifies for a Strengthen Oklahoma Homes grant?

The Oklahoma Insurance Department program is for an owner-occupied primary residence with wind coverage and a homestead exemption. Grants are up to $10,000 toward a FORTIFIED Roof, High Wind with the Hail Supplement. Funding is first come, first served while it lasts. Check the current round at oid.ok.gov/okready.

Does the grant pay the evaluator?

No. The evaluator's fee is not covered by the grant. The grant itself is paid to the contractor, and the program asks for three bids from approved contractors, so collect those before you choose.

Will a FORTIFIED roof lower my insurance?

Oklahoma law, 36 O.S. 962, says insurers must offer a discount on the wind and hail part of the premium for a FORTIFIED retrofit where it is actuarially justified. How much depends on your insurer, so ask your agent and send them the certificate once you have it.

How long is the FORTIFIED certificate good for?

Five years from when IBHS issues it. The certificate is yours, not ours, and it stays with you as the owner.

Can you put new shingles over the old ones?

Not on a FORTIFIED roof: the deck has to be bare to seal it and nail it. In Norman the city allows only one layer of asphalt shingles anyway. A tear-off also lets us replace soft deck boards before anything goes back on.

Call or text 405-555-0147

Cal measures it, writes it and photographs every stage

We replace roofs from Edmond across Oklahoma City, Moore, Norman, Yukon and Guthrie. Smaller problem? See roof repair.

Cal Brannigan, owner of Briarstone Roofing, in a clay red work shirt in front of a brick house

Cal Brannigan, owner and roofer

Cal answers the phone, gets on the roof and writes the estimate. On a FORTIFIED job he photographs every stage the evaluator needs to see.

Book a replacement estimate

We answer the same day. The night of a storm, we answer until the last tarp is down.

Shingles gone and rain coming in right now? Call or text: 405-555-0147

Two roofers in clay red shirts and safety harnesses nailing dark shingles on a brick house while the wind blows their shirts sideways

Want the next roof to stay on? Start with a measurement.

Tell us the address, roughly how old the roof is and whether you plan to apply for the grant. If a storm started this, give us the date too.

Book a free wind and storm check

We answer the same day. The night of a storm, we answer until the last tarp is down.

Shingles gone and rain coming in right now? Call or text: 405-555-0147

Call or text 405-555-0147